تقدير التكلفة الدقيقة لـ 500 متر مربع (متر مربع) مرفق التخزين البارد مقدمًا مستحيل بدون تفاصيل مشروع محددة. هذا هو السؤال الأول الذي يطرحه العديد من العملاء المحتملين, but the final price depends heavily on numerous technical and design choices. لكن, we can provide a rough benchmark estimate based on standard assumptions and outline the critical factors that drive costs.
Benchmark Estimate (For Reference Only):
Assumptions: Standard 3-meter ceiling height (resulting in ~1500 cubic meters volume), medium-temperature range (e.g., 0°C to +5°C), basic construction, standard insulation, and mid-range equipment.
نطاق التكلفة المقدر: Based on these assumptions, the construction cost for a 500 sqm cold room could roughly fall between $70,000 – $80,000 USD. Please note this is a highly generalized figure and actual costs can vary significantly.

500 square meters cold storage completed photos
Key Factors Influencing Your 500 SQM Cold Storage Cost:
The final investment for your cold storage project is determined by a combination of these critical elements:
1. Storage Specifications & Design:
Temperature Requirements: This is paramount. Lower temperatures (e.g., -20درجة مئوية, -40درجة مئوية) require significantly more powerful refrigeration systems, thicker insulation, and specialized components, drastically increasing costs compared to chillers (0°C to +10°C) or medium-temperature rooms.
Cool-down Time: Faster pull-down times necessitate larger, more powerful equipment.
Layout & Partitioning: A single large room is generally more economical. Adding multiple compartments or rooms increases complexity, requiring more walls (insulated panels), doors, separate refrigeration circuits, and controls, raising the overall cost.
Ceiling Height: While our estimate assumes 3m, greater heights increase the internal volume, requiring larger refrigeration capacity and potentially structural adaptations.
2.Building Envelope & Insulation:
Insulation Type & Thickness: The choice of core material (Polyurethane/PUR, Polystyrene/EPS, PIR) and panel thickness (e.g., 100mm, 120mm, 150mm, 200mm) is critical for thermal efficiency. High-performance polyurethane (PUR/PIR) panels offer superior insulation (lower K-value) but come at a higher cost than polystyrene (EPS). Thicker panels are essential for very low temperatures.
Panel Quality: The quality of the metal facings (steel gauge, coating) and the foam density/consistency impact durability, longevity, and insulation performance, influencing price.
3.Refrigeration System:
The single largest cost component. It includes compressors, condensers, evaporators, controls, piping, and refrigerant.
Capacity & Technology: Sized based on room volume, temperature, product load, and ambient conditions. Larger capacity and more advanced technology (e.g., CO2 cascade for very low temps) cost more.
Brand & Origin: Equipment from leading international brands (e.g., بيتزر, كوبلاند, Danfoss, إيمرسون) typically commands a premium due to proven reliability, efficiency, and technical support, especially in demanding applications. Domestic or regional brands may offer lower initial costs but potentially differ in long-term performance and efficiency.
Redundancy: Critical operations (e.g., pharmaceutical cold storage) often require backup systems (N+1 redundancy), adding significant cost.
4.موقع & Site Conditions:
Construction Location: Labor costs, material availability, and local regulations vary by region/country.
Site Accessibility & Preparation: Complex site access, extensive ground preparation, or integrating into an existing building add costs.
Utility Connections: Power supply capacity and requirements can impact costs.

The cold storage uses Japanese general Fuji refrigeration unit
5.Compliance & Special Requirements:
Industry Regulations: Facilities storing pharmaceuticals, food, or hazardous materials must comply with strict regulations (e.g., FDA, EU GDP, HACCP, ATEX for explosion-proof), requiring specialized design, مواد, documentation, and validation, significantly increasing investment.
Explosion-Proofing: Required in specific environments, involving specialized (and costly) equipment and construction methods.
Automation & Monitoring: Advanced control systems, remote monitoring, and data logging add cost but offer operational benefits.