Kazakhstan Almaty 15,500-Ton Multi-Functional Cold Storage & Logistics Center Project

1. Project Overview

This large-scale cold storage facility, located in Almaty, Kazakhstan, was designed and built to support a storage capacity of 15,500 tons (58,000 m³ total volume). The project was completed within a tight 60-day schedule, requiring highly efficient coordination and supply chain management.

The facility features multi-temperature zones with advanced controlled atmosphere (CA) technology, providing long-term preservation for both fresh produce and frozen products.

2. Core Requirements

🔹 Large-Scale Storage Capacity

  • Designed to handle 15,500 tons of food products.
  • Strong building structure and reliable refrigeration systems with high cooling capacity.
  • Optimized layout for efficient logistics and large-scale handling.

🔹 Multi-Temperature Cold Rooms

1.Chilled Storage Zone (-2°C to +5°C):

  • Dedicated for root vegetables such as potatoes, onions, carrots, and beets.
  • Stable temperature and high humidity environment to prevent chilling injury and water loss.

2.Variable Temperature / Freezer Zone (+20°C to -20°C):

  • Flexible design capable of switching between frozen storage (-18°C to -20°C) for fish, poultry, and other frozen goods, or chilled/ambient mode for seasonal demand.
  • Enhances overall storage utilization and maximizes economic efficiency.

🔹 Adaptability & Reliability

  • Tailored for Kazakhstan’s continental climate (hot summers, extremely cold winters).
  • Equipped with international-brand refrigeration equipment to ensure stable long-term operation and convenient local after-sales service.

3. Project Highlights

  • Total Capacity: 58,000 m³
  • Storage Volume: 15,500 tons
  • Temperature Zones: Split into chilled and variable temperature areas.
  • Technology: Advanced CA cold storage system with precise temperature & humidity control.
  • Construction Timeline: Completed in just 60 days.

This project plays a critical role in the regional food supply chain, providing year-round storage solutions for both fresh vegetables and frozen goods, while reducing food loss and increasing market supply flexibility.