Project Overview

Jiangsu Jichuan Pharmaceutical Group, a leading national high-tech enterprise and top 100 pharmaceutical company in China, required a foundational upgrade to its raw material logistics. This project involved the design and construction of a 17,500 cubic meter automated cold storage facility dedicated to storing sensitive pharmaceutical raw materials and biological reagents.

The facility was engineered as a GSP, ISO, and EN compliant automated storage and retrieval system (AS/RS), transitioning from traditional manual warehousing to a high-density, high-accuracy, and traceable digital cold chain hub. This shift directly addressed critical industry pain points: human error, temperature excursion risks, and inefficient space utilization.

Technical Solution

The facility was designed with two distinct, precisely controlled temperature zones to accommodate diverse product requirements.

System / Zone Specification Key Equipment & Features
Overall Facility Total Volume: 17,500 m³ Automated Storage & Retrieval System (AS/RS), Centralized Siemens PLC Control, Redundant (“N+1”) Configuration.
2-8°C Cold Storage Zone Insulation: 100mm B1 PUF Panel High-efficiency screw compressor parallel units, Bucket Pump Liquid Supply system for stable cooling.
-20°C Frozen Storage Zone Insulation: 150mm B1 PUF Panel Dedicated low-temperature screw compressor parallel units, Enhanced dehumidification system.
Control & Monitoring Standards: GSP/ISO/EN Fully automated control with dual-temperature sensors, auto-switch on fault/failure, real-time data logging & alarm (SMS/audio/visual).

Core System Advantages:

  • Unmatched Reliability: The “N+1” redundant compressor design and automated failover ensure 24/7 uninterrupted operation, which is non-negotiable for valuable pharmaceutical materials.
  • Regulatory Compliance by Design: Every component, from the sealed construction to the audit-trail-enabled control system, is built to meet and facilitate GSP, ISO, and EN certification audits.
  • Energy & Spatial Efficiency: The AS/RS system and high-density racking maximize storage capacity per square meter, while the inverter-driven compressors and optimal insulation minimize kW per ton of cooling.

Tangible Outcomes

This automated facility delivered transformative operational and financial benefits:

  1. Solved Inventory & Accuracy Challenges: The AS/RS system eliminates manual picking errors and provides perfect FIFO (First-In, First-Out) control, ensuring total batch traceability and compliance.
  2. Maximized Storage in Minimal Footprint: Through high-density automated racking, the 17,500m³ facility achieves an effective storage capacity equivalent to approximately 2,900 – 3,900 metric tons of raw materials (calculated at a volumetric ratio of 4.5-6 m³/ton), a density 40-60% higher than a traditional manual warehouse of the same volume.
  3. Guaranteed Product Integrity: The redundant systems and precision control (±0.5°C) virtually eliminate the risk of temperature excursions, protecting millions of dollars in inventory from spoilage.
  4. Project Timeline and Operational Efficiency: A complex project of this scale typically requires a 5-7 month design and construction period. The automation leads to 70-80% lower labor costs for handling and reduces energy consumption per pallet stored due to optimized operation and reduced door openings.

Construction & Completion Photos

Photos of the Jichuan Pharmaceutical Group factory area

Photos of the Jichuan Pharmaceutical Group factory area

Welding and fabricating the bracket.

Welding and fabricating the bracket.

Cutting C-shaped steel and welding brackets

Cutting C-shaped steel and welding brackets

Workers are lifting cold storage panels

Workers are lifting cold storage panels

Workers are lifting cold storage panels

Workers are lifting cold storage panels

Workers install shelves

Workers install shelves